Direct naar content

BS – Exchange reconciliation results electricity

Samenvatting

This business service describes the roles and responsibilities, the functional parameters and information exchange for the service Exchange settlement results electricity. Keep in mind that the dutch version is always leading.

Documentversies

DetailsVersieVaststelling
Download
Wijzigingen:

Changes:

•IC280L Scope change (changes due to RFC-005-A2.0-TR3 IC280L Scope change will be reversed because IC280L is back in scope);

•RFC-020-A2.0 IC280L Measurement month in reconciliation notifications;

•Add check 792 in section 3.5 Receiver checks for notification “Reconciliation results for aggregated ISP volumes” (from backlog);

•Add explanatory

Status
Vastgesteld
Release
Allocatie 2.0 - Tranche 4
Implementatiestatus
Niet live
Implementatiedatum
01-05-2026
Taal
Engels

7.0

23-12-2024

Download
Wijzigingen:
Status
Vastgesteld
Release
Allocatie 2.0 - Tranche 3
Implementatiestatus
Live
Taal
Engels

6.0

21-06-2024

Download
Wijzigingen:

Changed due to RFC A2.0-TR3-2, change definition and control to EDSN Settlement(result)run_ID

Status
Vastgesteld
Release
Allocatie 2.0 - Tranche 3
Implementatiestatus
Live
Taal
Engels

2.0

05-12-2023

Gerelateerde documenten

BRS – Reconciliatiegegevens Business Requirement Specification23-12-2024

Meer over ons

De Energiedatawijzer is de plek waar alle informatie en documentatie uit de energiesector samenkomt.

Hoe kunnen wij je helpen?

Op zoek naar het antwoord op een specifieke vraag? Bij onze veelgestelde vragen vind je de antwoorden.